Lots of updates today at the Eno Springs 1 Estate. Now that the stone and siding are finished on the outside, the front porch beams have been installed along with the porch ceiling, which will be stained. The front door, which will be stained to match the ceiling, and the front light fixtures have also been added in the last few weeks. Prep work has now begun for pouring the concrete walkways and garage parking pads at the house and the detached workshop beyond.

Continuing with the exterior updates, Trex decking is in the process of being installed on the back deck and two stone retaining walls have been built along the sides of the unfinished walkout basement. Additional low stone walls have been planned as part of the front landscaping near the end of construction.

Moving inside, the stone fireplace is complete and the hardwoods are fully installed. Our clients are currently in the process of choosing their floor stain now that the kitchen cabinets and fireplace stone is complete. Tile is also complete in all of the bathrooms and the kitchen backsplash was just installed, which looks just beautiful with all of the windows in this gorgeous kitchen.

Stay tuned for a few more updates on this Estate home as is nears completion very soon. To see me more of this build project, visit our Eno Springs Estate 1 page.

Progress Update at Eno Springs 1
Scroll to top
%d bloggers like this: