The Orange Grove Farmhouse made great progress this spring. All of the major systems are in place and is ready for whole house power hook up. All of the “fun stuff” is being installed inside and out, with the floors, cabinets, tile and trim work partially complete throughout the home.
Most of the countertops are also installed, along with light fixtures and plumbing fixtures. The outside fireplace on the back deck has been wrapped in stone and the screens should soon be installed. The Trex decking on the deck and stairs is also mostly complete. The exterior paint is being finished, including the striking red accents on the corbels over the garage. The front door with also have this matching red accent as a very final touch once the home is complete. We are exciting to see the end result very soon!
If you would like to see more about this custom project, see our Orange Grove Farmhouse page and stay tuned for the final update once this home is complete!